To the central content area

Water Pollution Sources Inspection and Water Pollution Control Fee Collection and Piggery Waste and Digestate for Use as Farmland Fertilizer

Absrtact
Abstracts The main work of the project can be divided into two sub-projects, namely : (1) Water Pollution Sources Inspection and Water Pollution Control Fee Collection, (2) Piggery Waste and Digestate for Use as Farmland Fertilizer, the implementation of November 30, 2017, work items and performance statistics, summarized as follows : (1) Water quality management of environmental water body : Water quality management once a month of Niuchou River, Bajhang River(including drainage at regional level) and Lan-tan Reservoir. The results of the monitoring are disclosed to Environmental Water Quality Information and the quarterly reports are submitted to the authorities For reference, please refer to chapter 3.1.1 for more detail. (2) Inspection of water pollution management institution and examination of water quality : As of November 30, inspections of 105 industries and 56 sampling tests have been completed with a completion rate of 100%, please refer to chapter 3.1.2 for more detail. (3) Strengthen inspection of water pollution management institution : For the high pollution and violation of water pollution-related laws and regulations of the key undertakings, agencies to handle the object such as active and active inspection and sampling. Strengthen Inspection of 8 industries have been completed, namely : Li Ker Co., Ltd., Kai Yang Co., Ltd., CPC Corporation, Taiwan Solvent & Chemical Business Division, Ditmanson Medical Foundation Chia-Yi Christian Hospital, Nice Plaza Co., Ltd., Chiayi Branch, Taichung Veterans Hospitial, Chiayi Meat Market and Chia-Yi Hosptial, Ministry of Health and Welfare, please refer to chapter 3.1.3 for more detail. (4) The water quantity automatic survey system : The use of Water Quantity Automatic Survey System implementation of water pollution management continuous monitoring 72 hours every month, according to the monthly on-site inspection status selected monthly scheduled implementation of institutions, 9 industries have been completed, namely : downstream of Stanley Security Solutions Taiwan Co., Ltd., upstream and downstream of Juyu No.2 Co., Ltd., downstream of Yongjinxin Co., Ltd., downstream of Lu Ya-ren Hospital, downstream of Ming-Fong Plating Co., Ltd., downstream of Chiayi Tsun Huang Hotel, downstream of Carrefour Beimen Store and downstream of Kai Yang Co., Ltd., please refer to chapter 3.1.4 for more detail. (5) Management of wastewater treatment facilities functional evaluation operations : After confirming the list by Environmental Protection Bureau, Chiayi city (CYCEPB), it will carry out the function evaluation of 6 industries, namely : Chinyi Eggs Technology Co., Ltd., Juyu No.2 Co., Ltd., Stanley Security Solutions Taiwan Co., Ltd., Yongjinxin Co., Ltd., Chiayi Wire Products Co., Ltd., please refer to chapter 3.1.9 for more detail. (6) Holding meetings for related policies or law announcement of water pollution : Holding 5 meetings for related policies or law announcement of water pollution in Chiayi Incineration Plant, please refer to chapter 3.1.13 for more detail. (7) Water pollution control fee collection and evaluation of the effectiveness of use : On March 28, 2017, EPA notified the letter No. 1060023084 to notify Chiayi of the 2016 water pollution control fee collection declared mistakes and should check the object, EPA considers the number of requisitioned households in each county and check the resources are different, according to the number of households should be declared as the basis for water and sewage charges, and submit the results of the inspection in two phases, the first phase of the city should be completed by May 30, Ten check-ups were sent to the EPA (including check-in records). The second phase should be completed by October 31 full check and sent to the EPD (including audit records). By the first and second phases of November 30, a total of 23 industries water pollution control fee collection have been completed, please refer to chapter 3.2 for more detail. (8) Patrol team counseling and education training and contact meetings : This program will be subject to four rounds of team training and liaison meetings. Four training sessions have been conducted on June 3, July 28, September 18 and October 24 to guide teachers through the guide , Enhance the promotion of environmental education in the future space so that patrolling members in the face of the public about the water environment patrol questioning or call for public participation, through this bridge of communication so that people of different backgrounds, ages, education levels can with the water environment patrol Keep the interaction. At present, there are 5 team patrol teams in the city. In order to enable water environment patrol teams to understand in depth the importance of river pollution prevention and control environment, conservation and biodiversity, and enhance patrolling professional capabilities and diversified development, On January 13 and September 29, two experts and scholars, including Dr. Hong and Dr. Ding, were invited to conduct on-site counseling for each team of the teams in the city. Relevant proposals were made according to the characteristics of the teams and their regionalities so as to facilitate the continued use of the team, please refer to chapter 3.3.3 and 3.3.4 for more detail (9) Coastal(reservoir) cleanup : Response April 22 World Earth Day, EPA hosts "2017 of Earth Day Coastal cleanup ". On the April 16 in Lan-tan Reservoir for clean Lan-tan, clean Chiayi activities. The total number of participants in this event was 918. A total of 37.2 kg of rubbish and 17.4 kg of recyclables were cleared and nearly 1,000 waste plastic bags and 100 kg of dry cell were recovered, please refer to chapter 3.3.6 for more detail. (10) Piggery waste and digestate for use as farmland fertilizer : In order to reach the goal of making full use of biogas slurry and biogas residue resources and protecting water bodies, the current discharge of livestock excrement is converted into the management of fertilizer by the identification of waste (waste water) or waste, so that livestock excrement can be returned to resources Management approach, EPA to actively promote piggery waste and digestate for use as farmland fertilizer. Chiayi City to promote Mingxiu livestock ranch biogas residue was resource utilization, on April 27 for the livestock ranch of biogas residue, biogas residue composition analysis, and on June 30 in the area of irrigated farmland collected 3 sites testing and 1 site groundwater testing, has been sent on August 17 Mingxiu livestock farms biogas residue fertilizer application of farmland to the city of agriculture, forestry, animal husbandry for the first instance, and on August 21 by the city of Agriculture, Forestry and Animal Husbandry Branch letter to farmers Committee reviewed the results of Council of Agriculture, Executive Yuan on September 20 has been covering the review results, the application was approved by the amendment, the Agriculture, Forestry and Animal Husbandry Branch on November 7 formally issued by the Mingxiu livestock ranch biogas slurry fertilizer application plan book. This year, we also conducted 3 sampling inspections for 2 companies, such as Jin Cong livestock ranch and Chiayi University livestock farms who are not willing to apply for biogas slurry residue this year, please refer to chapter 4.2 for more detail. (11) Other cooperation matters : (a) A total of 35 cases were reported as at November 30, including 10 cases of river and gutter pollution, 2 cases of reservoir pollution, 9 cases of wastewater discharge, 10 odor of ditch, 4 cases of smell of pig feces, All have sent personnel on-site inspection completed and informed Chen Valentine processing situation, odor inspection on-site no smell smell cases, in addition to wastewater discharge and water quality anomalies, on-site inspection of the situation without exception or to investigate the Chiayi County jurisdiction rights are transferred to the relevant The responsible unit to improve, please refer to chapter 3.1.12 for more detail. (b) Press Release: The project submits 1 press release each on March 13, April 11, September 5 and September 18, respectively. By November 30, 2017, a total of 4 press releases, please refer to chapter 3.6.1 for more detail.
Keyword
Water Pollution Sources Inspection、 Water Pollution Control Fee Collection
Open
top